Project services

Savant support, from schedule to handover

A compact workflow for teams that need traceable product choices, compatible controls and installation-ready documentation.

01

Application selection

We translate room use, ceiling construction, target illuminance, visual comfort and maintenance access into a practical luminaire shortlist. The review distinguishes initial lumens from maintained performance and flags configurations that require a dedicated photometric calculation.

02

Photometric documentation

Project teams receive the relevant IES or LDT path, distribution context and configuration notes. Files remain tied to the selected optics and lumen package; substitution requires a new check rather than assuming one file represents every option.

03

Controls coordination

Driver interface, occupancy sensing, daylight harvesting and network topology are reviewed together. We identify boundaries between 0-10V, DALI-2 and local wireless devices so commissioning responsibility is visible before installation.

04

Submittal and handover support

Schedules can be organized around ordering codes, mounting accessories, declared UL, CE or RoHS applicability, and replacement components. Availability, certification scope and emergency integration remain configuration- and market-specific. Before release, the review records voltage, driver interface, ceiling support, branch-circuit assumptions and the party responsible for programming each scene.

Working limits

Recommendations depend on accurate drawings, reflectance assumptions and operating schedules. Field conditions can alter measured illuminance, wireless coverage and sensor response. Final code compliance and commissioning acceptance remain with the licensed project parties.

A calculation also has practical boundaries. Furniture, partitions, surface finishes and dirt depreciation can change delivered light after the model is issued. Product samples help evaluate finish and perceived brightness, but a bench sample cannot reproduce the complete room. Controls trials should include low-end dimming, occupancy timeout, daylight response and emergency behavior with the intended devices. When those inputs are unavailable, Savant identifies the open assumption rather than presenting a provisional result as final.

Have a schedule ready?

Send it for a focused compatibility review.

Request project support